Instructions for Your New Sod

 

Before Sodding

Measure length x width of area then divide by 10 (sod rolls are generally 10 square feet, 2’ x 5’). Order extra if there will be some waste from cutting.

  • All old turf and excess debris must be removed.

  • Turn the soil to a depth of about 4 inches. You can use a spade, plow or rototiller.

  • Grade the area, either by power equipment or by hand raking.

  • Fill the low areas with topsoil. It’s best to have gradual contour. Grade should be about 1 inch below sidewalks to allow for thickness of the sod.

  • Apply a starter fertilizer to the soil. A 10-10-10 or 12-12-12 mix.


Sod Installation

Sod must be laid immediately upon arrival.

  • Start at the property line or along the driveway or sidewalk.

  • Roll it out and stagger the joints like rows of bricks. Make sure the joints are butted together not overlapping. You can cut the sod with a serrated knife.

  • You can roll the lawn with a light roller before you water. Never roll after watering.

  • Water the sod immediately after installation with a penetration of about 6 inches. Sod must be kept watered until fully rooted. DO NOT LET IT DRY OUT.

 

Sod Maintenance

Watering
Water once per week after the sod has fully rooted. Do not give frequent light sprinkles as this will lead to shallow root growth.

Mowing
Mowing can be done after the roots have been taken. For best results, never cut more than 1/3 of the grass blade at a time. Keep the grass blade height to 2”- 2 ½”. Make sure the mower blades are sharp. During faster growing periods you may need to increase the frequency of your mowing.

Feeding
To insure that the turf stays healthy you must feed it with a high-quality fertilizer every 6 weeks. Follow the manufacturer’s directions.

Previous
Previous

Picking the Right Stone for Your Landscape Project

Next
Next

Coated and Uncoated Grass Seed